 |
|
|
|
|
|
|
|
- (1)
- (1)
- (27)
- (2)
- (1)
- (2)
- (1)
- (9)
|
|
|
|
|

Build Your Online Product Catalogs?
Product Name: |
PC200-8 track chain 20Y-32-00300 genuine excavator part
|
Supply Ability: |
1000 |
Related proudcts |
track chain, pc200-8, |
Specifications |
20Y-30-00321 |
Price Term: |
FOB |
Port of loading: |
Qingdao or Shanghai |
Minimum Order |
1 |
Unit Price: |
1 |
|
PC200-8 track chain 20Y-32-00300 genuine excavator part We&©|160;also&©|160;supply&©|160;Excavator&©|160;Engine&©|160;parts,hydraulic parts,undercarriage parts,operator's cab parts,filters,electrical parts&©|160;with the best price for your market. A.&©|160;Undercarriage&©|160;***re&©|160;parts:&©|160;track&©|160;shoe,track&©|160;link,bolt,track&©|160;roller,carrier&©|160;roller,sprocket,ilder,idler&©|160;cushion,bushing,shaft,pin&©|160;etc. B.Engine&©|160;***re&©|160;parts&©|160;:cylinder&©|160;head,cylinder&©|160;block,turbocharger,piston,piston&©|160;ring,metal,crankshaft,oil&©|160;pump,fuel&©|160;injection&©|160;pump,water&©|160;pump,alternator,starting&©|160;motor&©|160;etc. C.Hydraulic&©|160;***re&©|160;parts&©|160;:main&©|160;valve,main&©|160;pump,solenoid&©|160;valve,boom/arm/bucket&©|160;cylinder,final&©|160;drive,travel&©|160;motor,swing&©|160;reduction&©|160;machine,swing&©|160;machinery&©|160;etc. D.&©|160;Driving&©|160;cabin:&©|160;operator's&©|160;cabin&©|160;ass'y,monitor,controller,engine&©|160;controller,wiring&©|160;harness,&©|160;operator's&©|160;seat,air&©|160;conditioner,air&©|160;copmressor&©|160;etc. |
Company: |
Jining Shante Songzheng Construction Machinery Co.,Ltd
|
Contact: |
Ms. Maggie Liu |
Address: |
22nd, Wanli Fude Squre, Jining, China |
Postcode: |
272000 |
Tel: |
86 537 3281390 |
Fax: |
86 537 3281230 |
E-mail: |
|
|
|